A construction drone shot list has ten shots: establishing wide, top-down site plan, orbit, reveal, push-in to the work face, perimeter track, lift or crane shot, low pass over the laydown yard, access and logistics, and a fixed progress frame you repeat every month. Film those ten on the first visit and you have a bid package, an owner update and a recruiting clip.
We flew this list weekly for seven months on Feraform’s Elliston Park parkade, alongside builder Kalamoir, and it is the list behind our drone video production in Calgary. Below: the ten shots, the flights and cost, Calgary airspace, and the progress route.
What should be on a drone shot list for a construction site? The ten shots
Ten shots cover almost every construction site, because they answer the four questions a viewer asks in order: where is this, how big is it, what is being built, and who is building it. The first three answer “where” and “how big”. The middle five show the work. The last two make the footage useful again, as a logistics record and a progress series.
Here is the list in the order we fly it. Altitudes are typical and always below Transport Canada’s 122-metre (400-foot) ceiling.
| Shot | What it shows | How it is flown | Used for |
|---|---|---|---|
| 1. Establishing wide | The whole site in its neighbourhood: roads, river, skyline | High, slow push or slow drift, 60–120 m | Opening shot of a bid video or proposal page |
| 2. Top-down site plan | Footprint, laydown, hoarding, access gates, as a plan view | Camera straight down, 60–100 m, hover or slow drift | Owner updates, logistics meetings, safety plans |
| 3. Orbit | The structure from every side, scale against machines and people | Slow circle at 30–60 m, structure centred | Hero shot for the website and social cuts |
| 4. Reveal | The build appearing over a hoarding, treeline or neighbouring roof | Rise or pull back from behind an obstruction | Story opening, before-and-after comparisons |
| 5. Push-in to the work face | Where the work is this week: deck pour, steel erection, envelope | Slow forward move at 20–40 m toward the active area | Proof of capability in a capability film |
| 6. Perimeter track | The length of the site along the fence line or haul road | Lateral move at 20–40 m, constant height and speed | Shows scale; cuts well under narration |
| 7. Lift or crane shot | A pick in progress, rigging, the operator’s line of sight | Static frame or slow orbit, outside the lift zone | Recruiting clips, safety culture, owner confidence |
| 8. Low pass over laydown | Materials, equipment, the organised yard | Low pass at 10–20 m over materials, never over people | Shows planning and site discipline |
| 9. Access and logistics | Entrances, truck routes, neighbouring properties, utilities | Medium height, following the route a truck takes | Pre-construction records, traffic plans, neighbour relations |
| 10. Progress frame | One fixed position, heading and height, repeated each visit | Same coordinates every flight, same lens, same time of day | Monthly progress series, timelapse of the whole build |
Three things the table does not say:
- Shot 10 is planned first. The progress frame only works if the position is saved on the first flight and never changed. The best angle for a finished building is not always the best angle for a hole in the ground.
- People stay out of the frame unless they are the point. Shot 7 is about the operator and the rigging crew, filmed from outside the exclusion zone. Everywhere else, the route keeps the drone off anyone who is not part of the flight.
- Fly it in the morning. Low sun shows depth on a flat site, and Calgary wind builds through the afternoon.
At a glance
- Deliverable: 4K aerial package plus a stills library from the same flight
- Shoot: one visit films all ten shots on most sites; large or multi-building sites take two
- Timeline: a standard project takes 3 weeks (week 1 pre-production, week 2 shoot, week 3 post-production and delivery); a monthly progress series runs for the life of the project
- Drone: Founder Jared Ho holds an advanced RPAS licence certified by Transport Canada
- Paperwork provided before the flight: proof of licence, liability insurance, a written flight plan and, afterward, the flight log
- Weather-postponed flights are rescheduled at no additional cost
How many flights does the list take, and what does that do to the cost?
One visit films the full list on most sites, usually two or three flights of about 20 minutes each with battery changes between them. A large site with more than one building takes a second visit. After that, the cost question is how often you repeat shot 10, because a progress series is a flight per month for the life of the build.
We don’t publish prices on this blog because the number depends on the list below. These are the drivers that move a drone quote in either direction.
| Driver | Pushes the price up when | How to keep it down |
|---|---|---|
| Number of visits | Monthly progress flights over an 18-month build | Fly milestones, not months, on short projects |
| Site size | Several buildings or a long linear site need relocating the launch point | One establishing position, one orbit per structure |
| Airspace | The site sits in controlled airspace and needs authorization per flight | Send the address early so the request is filed in pre-production |
| Weather | Wind postpones the flight and the pilot returns | Book flexible windows; a postponed flight is rescheduled at no additional cost |
| Edit scope | Every visit is cut into a finished film | Monthly stills plus one film per quarter |
| Marketing cuts | Social and proposal cuts are added after the flight | Decide the cuts before the first visit so the route serves them |
The cheapest quote is often the one that cannot legally fly your site. Transport Canada’s fines for a corporation run up to $5,000 for flying without a pilot certificate, up to $15,000 for flying where drones are not permitted, and up to $25,000 for an unregistered or unmarked drone. The fine lands on the operator, but your bid video has a gap where the aerials should be. Our post on how much drone videography costs covers the market range and what a legitimate quote includes, and drone photos vs drone video explains when a stills-only flight is enough.
For a fixed quote on your site, the drone video page lists what we need from you before we price it.
Flying the list in Calgary airspace: advanced RPAS licence, authorization and site rules
An active construction site is an advanced operation under Transport Canada’s rules, and in much of Calgary it also sits in controlled airspace. Both facts are settled before the shot list is. Founder Jared Ho holds an advanced RPAS licence certified by Transport Canada, and airspace authorization is arranged before each flight where required.
Why it is an advanced operation. Transport Canada’s basic category requires the drone to stay more than 30 metres horizontally from any person, in uncontrolled airspace, more than 5.6 km from the centre of a certified airport and more than 1.9 km from a certified heliport. A working site breaks the 30-metre rule the moment a crew is on it. Advanced operations allow a small drone, with the right safety declaration, to fly in controlled airspace with air traffic control permission, closer than 30 metres but more than 5 metres from people, and within 5 metres or over people. Shots 5, 7 and 8 on the list depend on those permissions.
Controlled airspace. Around Calgary International Airport and the heliports, the flight needs permission before take-off. Requests go through NAV CANADA’s NAV Drone system, which only accepts a profile holding a Pilot Certificate – Advanced Operations. Flights at or below the altitude threshold for the grid cells over the site are approved automatically; anything higher goes to a manual review that NAV CANADA says can take up to two weeks and usually takes one. That is why the address comes first: on a low-ceiling cell, shot 1 may be flown at 60 metres rather than 120. Our guide to drone videography regulations in Canada covers the certificate and airspace rules in full.
On the site. The prime contractor gets the written flight plan before the visit: launch point, route, altitudes, the exclusion zone under the lift, and the signal for pausing a flight. The pilot takes the same orientation as any visiting trade and wears the PPE the site requires. Crews are told which lane the drone uses for shots 6 and 8. Our post on bringing a film crew onto a construction site lists what to require of any crew before they arrive.
Neighbours. Shots 1, 4 and 9 point the camera off the site, and a route that lingers over a neighbour’s yard is a complaint waiting to happen. We frame those shots to the project and keep the flight path over land the client controls where we can. Our post on drone privacy on job sites covers what you can and cannot fly over.
We work from 118 Waterfront Ct SW in Calgary and fly across Alberta, with no travel fee inside the city.
Repeat the route: turning the shot list into a progress record
Shot 10, flown from the same saved position every month, turns a one-day shoot into a progress record an owner or lender can read in two minutes. The first flight is the baseline. Each later flight repeats the position, heading, height and lens, so the only thing that changes in the frame is the building. Twelve frames cut together become a timelapse of the whole project that no fixed camera could capture.
A cadence that works on a 12-month build:
- Before mobilization. Fly the full list once to record existing conditions, and save the progress position.
- Monthly. Fly shot 10 plus the orbit and the work-face push-in. Stills from each go into the owner update.
- Milestones. Foundation complete, topping out, envelope closed, substantial completion. Fly the full list again and cut a short film from both months and milestones.
- Handover. The complete progress series, the full aerial library and a finished project story for the website and the next bid.
The same footage carries beyond the report. On Bright Home’s custom home build in Calgary, drone progress footage sat alongside walkthroughs explaining each phase, and one set of material served the owner’s updates and the builder’s marketing. The establishing wide from month one opens a capability film. The orbit from topping out becomes the proposal clip that answers “have you built one of these before?” Our guides to drone video for construction progress reporting and construction progress reporting videos go deeper on the reporting side, and why contractors lose bids explains where the aerials go in a bid package.
Drone shot list for construction: FAQ
What are the best drone shots for construction marketing? The orbit, the reveal and the establishing wide. They show scale and setting, which a prospect cannot get from a ground photo. The work-face push-in proves you did the work.
How high should a construction drone fly? Between 20 and 120 metres depending on the shot, and never above Transport Canada’s 122-metre (400-foot) ceiling. In controlled airspace the grid-cell threshold for the site may set a lower limit, which is confirmed before the flight.
Can a drone fly over workers on a construction site? Only as an advanced operation with a drone that carries the right safety declaration, and we plan the route so it does not need to. Shots are flown beside the work, not over the crew, and the exclusion zone under any lift is respected.
Do I need permission to fly a drone over my own job site in Calgary? Yes, in most of the city. If the site is in controlled airspace, the pilot needs an advanced certificate and air traffic control permission through NAV Drone before every flight, whoever owns the land.
Put aerials in your next bid
Send us the site address and the date you need the footage by. We check the airspace, send the prime contractor a flight plan, and come back with a written scope and price before any work starts. Book a free 15–30 minute call through our contact page, or start from the drone video production page to see what an aerial package includes.
IMAGE 1: Top-down aerial of a multi-level parkade under construction, laydown yard, crane and surrounding streets in frame | Caption: “Shot 2, the top-down site plan, flown weekly over Feraform’s Elliston Park parkade alongside builder Kalamoir (Footage: Storimatic Studio)” | Alt: “Straight-down drone view of a concrete parkade under construction with crane and laydown yard”
IMAGE 2: Pilot at the fence line in hard hat and vest, controller in hand, drone visible above the site, flight plan printout clipped to the fence | Caption: “Aerial · RPAS advanced: airspace authorization arranged before the flight (Footage: Storimatic Studio)” | Alt: “Drone pilot in safety vest operating a controller at a construction site fence”
IMAGE 3: Aerial orbit frame of a custom home at framing stage, trusses going on, suburban street in the background | Caption: “Shot 3, the orbit, from the drone progress footage on the Bright Home custom build in Calgary (Footage: Storimatic Studio)” | Alt: “Aerial drone view circling a custom home at framing stage with roof trusses being installed”
SEO META
- Plan ID | Type | Service | Tầng: STM-081 | Bài mới | Drone | Tầng 1
- Category: Drone Video | Tags: Drone, Field Production
- Main keyword: drone shot list for construction | Secondary: construction drone shots; aerial shot list construction site; best drone shots for construction marketing
- Funnel stage: Tầng 1 (need + proof)
- Internal links placed: /drone-video-production-calgary/ (intro ≤30% + cost section + CTA) · /blog/drone-videography-cost/ (same silo, next Tầng 2) · /blog/drone-photos-vs-drone-video/ (same silo, Tầng 2) · /blog/drone-videography-regulations/ · /blog/film-crew-on-a-construction-site/ · /blog/drone-privacy-on-job-sites/ · /blog/aerial-progress-reporting-drone/ · /blog/progress-reporting-videos/ · /blog/why-contractors-lose-bids/ · /contact-us/ (all checked 200 on 2026-10-22)
- Sources (URL): Transport Canada basic operations: more than 30 m from any person, uncontrolled airspace, 5.6 km from a certified airport, 1.9 km from a certified heliport → https://tc.canada.ca/en/aviation/drone-safety/learn-rules-you-fly-your-drone/drone-operation-categories-pilot-certificates/basic-operations · Transport Canada advanced operations: controlled airspace with ATC permission, less than 30 m but more than 5 m from people, within 5 m or over people, with the required safety declaration → https://tc.canada.ca/en/aviation/drone-safety/learn-rules-you-fly-your-drone/drone-operation-categories-pilot-certificates/advanced-operations · Transport Canada fines for corporations ($5,000 / $15,000 / $25,000) → https://tc.canada.ca/en/aviation/drone-safety/learn-rules-you-fly-your-drone/flying-your-drone-safely-legally · Transport Canada 2025 changes, 122 m (400 ft) ceiling → https://tc.canada.ca/en/aviation/drone-safety/2025-summary-changes-canada-drone-regulations · NAV CANADA NAV Drone FAQ: Advanced certificate required, automatic approval at or below grid-cell threshold, manual review up to two weeks, typically one week → https://www.navcanada.ca/en/nav-drone-faq.aspx
- Entities used: Feraform’s Elliston Park parkade, alongside builder Kalamoir, seven months of weekly documentation (§4) · Bright Home drone progress footage plus walkthroughs (§4) · drone page: construction progress on a fixed flight path, paperwork list (licence, insurance, flight plan, flight log), “4K aerial package + stills library”, weather-postponed flights rescheduled at no additional cost (§3) · drone credential exact wording · airspace authorization line · 3-week standard timeline · 118 Waterfront Ct SW · no travel fee in Calgary · “a free 15–30 minute call”
- 301 cần làm: none
- Images: 3 suggestions with real-shoot captions, each ending “(Footage: Storimatic Studio)”
- Meta title = sheet Title (38 chars), no change needed
- Checks: no Storimatic price (fine amounts are Transport Canada’s) · no competitor link · no client/studio figure unless marked “sourced” (none used; “$2.3M Bright Homes” not used) · timeline matches the service · call = “free 15–30 minute call” · no ownership promise beyond the event-page line (none made) · Sorell Insulation not mentioned · drone wording exact · tables ≤4 columns · answers ≤80 words